IV. Bio Green System Technology Facility Site

Bio Green System Technology Plants can make electricity continually in 5 MW per hour increments and can recycle up to 720 tons of garbage and destroy up to 172 tons of non-recyclable garbage per day. And a 5 MW per hour plant requires 15,000 square feet as an area for the facility.The three factors that must be taken into account in its site location are the following:

Here are the lists of materials to be used in the Bio Green System Technology gasification process:

  • Proximity to a sustainable waste supply
  • Proximity to a suitable water supply. This could be a river, lake, dam or sewerage treatment plant or the sea;
  • Proximity to a suitable power grid.